Our Past Projects
OUR VIBRANT AND SKILLED TEAM CONSISTENTLY DELIVERS TOP-TIER COILED TUBING SUPPORT OPERATIONS — ENSURING SAFE, EFFICIENT, AND RELIABLE INTERVENTIONS THAT MEET AND EXCEED CLIENT EXPECTATIONS.
FRONTIER OIL – CONSTRUCTION & INSTALLATION OF 8” X 9KM OF UQUO WELL 7,8 & 9 AND 4” X 9KM WATER INJECTION WELL FLOWLINES IN UQUDO FIELD NEAR EKET (OML-13)
CTU Nitrogen Lift & Well Clean-Up – Ibigwe 16: We successfully executed a Coiled Tubing Unit (CTU) Nitrogen Lift and Well Clean-Up operation at Ibigwe 16.
The operation deployed our HT-400 Triplex Pump with experienced personnel, ensuring safe and efficient well restoration. This intervention optimized production while maintaining strict compliance with HSE
standards.
Pumping & Pressure Testing – Assa E: We also provided Pumping and Pressure Testing services at Assa E, supporting a coiled tubing spread with our HT-400 Triplex Pump.
The job was carried out as a lump-sum engagement, with mobilization starting immediately
upon dispatch of equipment and personnel from our base.
The service enhanced system integrity validation and supported overall well intervention activities in the field.




